Akon Phase 2
Akon Phase 2
Private Resort Pool Restoration & Transformation
Akon Residence — Georgia
Design + Direction · Kavor Studios
Construction Partner · Alpha Contractors
September 2026
Total Investment
$228,759.15
Labor & Materials Included
Scope Summary
Project Vision
Kavor Studios proposes the complete restoration and transformation of the existing pool environment into a private luxury resort experience designed specifically for the residence.
The objective is larger than repairing a damaged swimming pool.
The existing pool has been substantially stripped of its original finishes, tile and portions of its plumbing infrastructure. The project therefore requires a combination of technical restoration, reconstruction, custom fabrication and new architectural design before the pool can be returned to service.
Kavor's approved design builds upon the existing pool geometry while introducing a more sophisticated architectural vocabulary of water, light, custom stonework, precision coping, specialty tile and resort-style outdoor living.
The finished environment is intended to feel as considered as the residence itself: clean, sculptural, dramatic and unmistakably custom.
Section 1
The pool is presently in an unfinished reconstruction condition following prior demolition and remediation work.
Existing tile has been removed, portions of the plumbing system require tracing and restoration, and the exposed pool shell requires preparation and repair before new finishes can be installed.
Rather than simply replacing what existed previously, Kavor Studios is using this opportunity to rebuild the pool as a substantially more refined architectural feature.

Section 2
Prior to installation of any finish materials, the existing pool surfaces will be inspected, prepared and repaired as required.
The construction scope includes preparation and repair of the pool walls prior to tile installation. Alpha Contractors has allocated $7,475 for this work within its construction estimate.
Work will include, as required: removal of loose or compromised material; surface preparation; localized repair of deteriorated areas; correction of substrate irregularities; preparation of bonding surfaces; repair of areas affected during previous demolition; and final preparation for new waterproofing, tile and PebbleTec finishes.
The intent is to establish a stable, properly prepared substrate before any decorative finish is installed.
Section 3
The pool will receive a completely renewed interior surface utilizing PebbleTec or equivalent premium aggregate pool finish in the owner's selected color.
The GC scope includes pool repairs where necessary followed by installation of the new PebbleTec finish. The contractor has allocated $62,100 for this portion of the work.
This creates the visual foundation of the new pool.
The selected finish will be coordinated with:
The objective is a consistent water appearance throughout the complete pool environment rather than a collection of unrelated finishes.
Section 4
The existing tile system will be replaced with a new coordinated architectural tile package.
The contractor's base estimate includes tile inlay work within the main pool, shallow pool and infinity-edge channel, with labor and materials valued at $36,800.
Kavor's completed design package expands the visual treatment beyond the basic pool waterline.
Included Tile Areas
The finished installation is intended to address:
Additional Kavor Enhancement
The rear wall and whirlpool/spa treatment will also receive coordinated tile detailing as part of the completed Kavor design, even where those areas are not separately identified in the underlying contractor estimate.
These enhancements are being incorporated into the project to ensure the finished environment reads as one architectural composition.
Section 5
One of the defining elements of the pool transformation will be the completely redesigned coping.
This is not intended to resemble ordinary field-installed residential pool coping.
Alpha Contractors' construction estimate allocates $74,750 toward custom coping for the main pool, shallow pool and jacuzzi, including integrated tracking and wiring provisions for lighting.
Precision Fabrication
Where practical, specialty coping pieces and molds will be fabricated off-site in a controlled environment.
This allows the design team to achieve:
Completed components will then be transported to the residence and professionally installed. The intent is for the coping to appear architecturally manufactured rather than improvised on site.
Integrated Custom LED Lighting
The coping system is engineered to house custom LED lighting channels directly within the stone — creating a seamless, uninterrupted glow along the entire pool perimeter and every step.
This is not aftermarket lighting added after installation. The lighting is built into the architecture of the coping itself:
The result is a perimeter and step system that reads as a single continuous architectural element by day and a sculptural ribbon of light by night. This level of integration is what separates a luxury installation from a standard pool renovation.
Seamless Materials & Lasting Quality
Every coping piece, step tread and perimeter edge will be fabricated from premium-grade stone selected and finished to endure a lifetime of outdoor exposure without degradation.
The material strategy is built around longevity:
The combined coping, lighting, PebbleTec and tile program is designed to look as refined in fifteen years as it does on the day of completion. This is a permanent architectural improvement, not a maintenance cycle.
Section 6
Pool steps will receive particular design attention.
These areas frequently reveal the quality difference between a basic pool renovation and a custom architectural installation.
Each step condition will be evaluated for:
Where the design requires specialty profiles or transitions, custom mold work will be utilized to maintain the same precision found throughout the perimeter coping. The goal is for the steps to feel integrated into the architecture of the pool rather than simply resurfaced.
Section 7
Lighting will become one of the signature elements of the completed pool.
The contractor's existing scope includes RGB lighting and associated wiring around both pool areas, stepping elements and the jacuzzi, with an allowance of $48,300.
Kavor's completed design further incorporates architectural lighting around the pool perimeter.
Lighting Intent
The lighting will be designed to:
Rather than relying exclusively on conventional underwater pool lights, the design uses integrated architectural illumination as part of the overall composition. The pool should have a distinct identity in daylight and an entirely different experience at night.
Section 8
Because portions of the original pool system have been disturbed or removed, the plumbing infrastructure must be carefully evaluated before the pool returns to service.
The GC scope includes:
Alpha Contractors has allocated $20,585 toward this plumbing restoration scope. The contractor's written estimate specifically states that this amount does not include pumps, heaters or filters. Existing equipment will therefore be evaluated during execution and coordinated separately if equipment replacement becomes necessary.
Section 9
The existing infinity-edge system will be incorporated into the new design rather than treated as a separate visual element.
Work will coordinate:
The edge must function technically while maintaining the clean horizontal visual language of the finished pool.
Section 12
The sunken conversation lounge will be designed so that an integrated gas fire feature can be incorporated as an option.
The feature could function as either:
Final fire-feature specifications would be coordinated with available gas service, clearances and applicable construction requirements. By establishing the required infrastructure during construction, the feature can become part of the architecture rather than appearing as an accessory added later.
Section 13
The existing whirlpool will be visually integrated into the complete pool environment.
Kavor's finished design includes additional attention to:
The spa should read as another intentional architectural element rather than a separately finished component.
Section 14
The rear pool wall will receive a coordinated architectural tile treatment.
This treatment is being incorporated to create a more complete visual backdrop for the pool and improve the experience when the environment is viewed from the residence.
Rather than leaving this surface visually disconnected from the newly finished pool, the wall becomes part of the composition.
This is an included Kavor design enhancement.
Section 15
As part of the overall project delivery, Kavor Studios is incorporating several enhancements beyond the basic pool restoration scope.
These include:
These elements are included within the proposed turnkey project and are not being presented to the client as separate change-order upgrades.
Section 18
Alpha Contractors' underlying construction estimate dated September 2, 2026 totals $228,759.15 and includes pool-wall preparation, tile work, custom coping, RGB lighting, PebbleTec restoration and plumbing work.
All prices include all time, labor and materials. There are no additional contractor fees, surcharges or hidden costs beyond the figures shown.
Alpha Contractors — Estimate #107 · 09/02/2026
Labor & Materials
Pool Wall Prep & Repair
Prep and repair walls for tile inside pool
$6,839.63
Tile Inlay
Main pool, shallow pool and inside channel for infinity edge
$33,672.00
Custom Pool Coping
Main pool, shallow pool and jacuzzi — with inlay tracking and wiring for lighting
$68,396.25
RGB Lighting & Wiring
Around both pools, stepping stones and jacuzzi
$44,194.50
PebbleTec Interior Finish
Repair pools where needed, new PebbleTec to owner's color choice
$56,821.50
Plumbing Restoration
Replumb, check, trace, repair lines & replace valves — excludes pumps, heaters, filters
$18,835.28
Alpha Contractors Subtotal
$228,759.15
All prices include all time, labor & materials
Total Project Investment
Includes all time, labor & materials
$228,759.15
The total represents the planned comprehensive design and construction program described herein. Every line item and subtotal includes all labor, materials and time required to complete the work.
Section 19
Kavor Studios will provide design direction throughout the execution of the project to protect the approved design intent.
This includes coordination of:
Kavor's responsibility is not simply to provide a rendering and leave execution to interpretation. The intention is to carry the design language from concept through construction.
Section 16
When completed, the environment will no longer present as a repaired pool. It will become a private resort destination.
Day
The pool will feature crisp architectural lines, carefully coordinated water color, custom coping, premium aggregate finishes, refined tile work and a dedicated outdoor lounge environment.
Night
Integrated lighting transforms the perimeter, infinity edge, steps, spa and architectural surfaces. Water becomes reflective. The coping appears illuminated. The recessed lounge becomes an intimate entertaining environment. The pool becomes an architectural feature visible from inside the residence.
Section 17
Asset Recovery
The project returns a substantially disrupted pool environment to proper functional condition.
Infrastructure Value
Plumbing, surfaces, tile systems, coping, lighting and other permanent systems are being restored or substantially renewed.
Capital Improvement
The project introduces permanent improvements rather than temporary décor.
Architectural Value
Custom coping, specialty molds, architectural lighting, tiled feature surfaces and coordinated materials create a level of execution substantially beyond a conventional pool resurfacing.
Lifestyle Value
The west-side lounge creates a completely new entertaining environment around the pool.
Nighttime Value
Architectural lighting extends the pool's visual impact far beyond daylight hours and allows the environment to function as part of the residence's nighttime experience.
Property Presentation
The pool becomes a signature feature of the property rather than an area requiring rehabilitation.
Section 20
"Does the pool work?"
Does the completed environment look intentional, precise and appropriate for the residence?
Alignment matters.
Transitions matter.
Lighting matters.
Joint lines matter.
Coping dimensions matter.
Edge conditions matter.
Water color matters.
The relationship between the pool, spa, feature wall and lounge matters.
The objective is to deliver an environment where those elements disappear into one cohesive design.
The Transformation
From
A pool that has undergone substantial demolition, removal of finishes and disruption of existing systems.
To
A completely restored and redesigned private resort environment featuring:
Kavor Studios
WE ARE NOT SIMPLY RESTORING THE POOL.
WE ARE TURNING THE ENTIRE AREA BACK INTO AN ASSET — AND THEN TAKING IT BEYOND WHAT IT WAS BEFORE.
Private Resort Pool Transformation
Akon Residence · Georgia