A preliminary concept for an independently engineered retained-water basin at 12675 Silver Fox Court — preserving the lake viewshed while integrating with Toll Brothers' dam-safety objectives.
Property
12675 Silver Fox Court
Location
Milton, Georgia 30075
Lot Size
74,348 sq ft · 1.707 Acres
Water Feature
Tharp Lake — Irene/Tharp Dam
Retained Zone
±150 ft Radius · ~3.2 Acres
Zoning
AG-1 — Single Family Estate
On-Site Documentation
First-person documentation of the creek, waterfall, lake, and dock at 12675 Silver Fox Court — providing engineers direct visual context for the retained-water basin concept.
The Vision
We are not asking Toll Brothers to abandon the proposed permanent breach of the Irene/Tharp Lake dam. Instead, we are asking engineers to evaluate whether a separate, independently engineered retained-water basin can be created adjacent to 12675 Silver Fox Court while allowing Toll's permanent breach and downstream stream-restoration work to proceed.
Nearly half of the home's interior — 24 doors and 8 windows — is oriented directly toward the lake. The architecture of the home is fundamentally connected to this view. If the lake is simply drained, that condition will become the dominant view from virtually the entire rear half of our home, potentially for generations.
Permanent 150 ft Retained Pool
Water-tight engineered wall secures pool when existing dam is breached.
Hidden Overflow Weir
Protects water level — low-profile, out of sight from backyard.
Continuous Creek Inflow
Shared stream continues to fill and sustain the retained pool after breach.
Fully Integrated with Toll's Plan
Compatible with proposed roads, lots, trails, and stormwater systems.
Mature Trees Preserved
Existing dock, walkway, and stream crossing preserved as-is.
Engineering Reference Documents
Both documents are viewable in-page and available for download. These are preliminary concepts subject to hydrologic, geotechnical, structural, and regulatory engineering.
Site Plan & Concept Deck
Existing Property Overview & Concept Plans
Complete site plan including property boundary survey, existing conditions, Tharp Lake retention concept, and Final Master Plan integrating Toll Brothers' dam improvements.
Engineering Proposal Letter
Letter to Toll Brothers — Retained-Water Solution
Formal correspondence from Kevin & Dejah Watson to Toll Brothers requesting engineering evaluation of an independently engineered retained-water basin adjacent to 12675 Silver Fox Court.
The Property — Undisturbed
Aerial and on-site photography of 12675 Silver Fox Court — the lake, dock, mature trees, and home as they exist today.

Four-angle aerial survey showing the full lake, home, pool, and mature tree canopy.
Awaiting photo for page 7
View from the dock across Tharp Lake — the primary view from 24 doors and 8 windows.
Awaiting photo for page 8
Satellite context and personal lakeside photography showing the daily quality of life at the property.
Awaiting photo for page 9
Bird's-eye view showing the home nestled within mature trees with the lake directly behind.
Awaiting photo for page 10
Wide aerial showing the full lake surface, dock, and intimate relationship between home and water.
Awaiting photo for page 11
Close aerial of the rear elevation, tree buffer, and lake edge that defines the property character.
Property Owners
Kevin & Dejah Watson
12675 Silver Fox Court · Milton, GA 30075
Presented via